Project Description
Name of Project: Airport Hanger
New construction of a 500,000 square foot hanger. Included office space, lighting, power, fire alarm and communication systems.
Name of Project: Airport Hanger
New construction of a 500,000 square foot hanger. Included office space, lighting, power, fire alarm and communication systems.
Name of Project: N2 Pad
Installed High Voltage (13,200v) to New Load Center in parallel 6” conduits. Make High Voltage terminations. Installation of 480 volt distribution to N2 equipment.
Name of Project: Clean Room
Installed distribution to clean room equipment. Included lighting, Low Voltage switching, Fire Alarm for new 40,000 square foot space.
Name of Project: Village of Goshen WWTP Upgrade
New 2.4 MGD waste water facility. Included new primary service with pad mounted medium voltage Switchgear and transformer. Secondary service consisted of a 3000amp custom switch board with integral automatic transfer switch. Stand by power was accomplished through the use of (5) 200kw generators connected in parallel. Secondary distribution consisted of several switch boards and motor control centers (MCC’s) located in various new buildings throughout the site. Supervisory Control and Data Acquisition (SCADA) was accomplished through the use of multiple programmable logic controllers (PLC’s) strategically located throughout the facility. Wireless telemetry was also used in some cases to transmit data. AllenBradley Device NET was used to interconnect the MCC’s back to the PLC. Careful coordination and integration with many different process skid manufacturers and vendors resulted in a state of the art, fully automated waste water treatment facility capable of running in multiple automatic and manual modes.
Name of Project: Renovations-PH I & PH 2
Lighting upgrades to meet NYSERDA requirements. Installation of an emergency generator back up system to be utilized as an emergency shelter if required.
Name of Project: Renovations and Upgrades
Lighting and HVAC upgrades at 7 schools within the school district.
New primary service to pad mounted transformer, secondary service consisted of new 4000amp switchboard and numerous panel boards located throughout the school. Also included was a new second story addition which included new power, lighting, fire alarm, A/V wiring, and category 6 communication wiring.
The Auditorium was also completely remodeled as part of the project, which included a new theatrical dimming system, new rigging with automatic hoist and all new theatrical lighting, including the highly ornamental house chandeliers. Also included in the auditorium was a new sound system, complete with new speakers, amplifiers, microphones, and wireless headsets.
Name of Project: New Bus Wash Equipment
Provide power and control wiring for new bus wash stations at the County Loop Bus Terminal.
Name of Project: Renovations to Lefevre Hall
Demolition of existing 3 story dormitory facility and complete rewire; including basement and addition of new mezzanine mechanical level. Project had extremely aggressive construction schedule mandating final completion within 7 months. Work consisted of new primary service and secondary power distribution, all new branch circuit wiring, and new LED lighting throughout.
Fire and Security systems Included, class A fire alarm with mass notification, extensive card access system, CCTV, and emergency phone. Energy management was accomplished using programmable logic controllers and Siemens digital control system.
Telecommunications consisted of single and multi-mode fiber optic back bone, multiple 75 pair voice cabling, category 6 horizontal cabling, and RG6U coaxial cabling.
J&J Sass was the sole electrical contractor onsite responsible for every facet of electrical construction associated with the project. Project was safely completed on time!
Name of Project: Bank Renovation
Design/Build 90,000 square feet of Office space. Included main distribution, branch circuits, lighting, power and phone/data cabling.
Name of Project: Emergency Generator Stanfordville
New 400amp Service Upgrade and 140KW Emergency Generator.